The Critical Path Institute
Work here?
Claiming is free. Correct your details, add a description, and publish a verified record of your team's export-control training.
Claim this listingUEI
KAEPADMRKHD3
CAGE
35JZ0
Registration
ACTIVE
Expires
2026-11-19
Primary NAICS
541715
Purpose
ALL AWARDS
Export-control exposure
Scoring v1.3 · Methodology
30
of 100
Low exposure
Nothing in this registration suggests controlled work today. That is a statement about the record, not a clearance — a single subcontract can change it without changing any code.
How this score was calculated
Primary industry
of 50
24
Additional controlled industries
of 20
0
Product codes
of 20
0
Registration posture
of 10
10
Exposure score
raw 34
30
Capped: no manufacturing industry code and no strong product-code evidence — raw score 34 reduced to 30.
This score is an indicator built from public industry and product codes. It is not a jurisdiction determination — only a commodity jurisdiction review of actual articles and technical data establishes what is USML-controlled. It is not a finding about this company's compliance program, and it is not legal advice.
Registered industry codes
1 NAICS · 0 PSC
| Code | Description | Tier |
|---|---|---|
| 541715Primary | R&D in Physical, Engineering and Life Sciences | C |
Registration history
SAM.gov
2026-11-19 · in 34 days
Registration expires
Renewal requires re-attesting to the FAR and DFARS representations, including the export-control provisions.
2025-11-20
Registration activated
2005-01-20
First registered in SAM
Change history accumulates from monthly extracts. This record was first indexed recently, so only the registration dates are available so far.