Directory/NY/Critical Path Engineering Solutions Pllc

Critical Path Engineering Solutions Pllc

Cazenovia, NY Unclaimed listing
Work here?

Claiming is free. Correct your details, add a description, and publish a verified record of your team's export-control training.

Claim this listing
UEI
JSUDJ9KJ6265
CAGE
7QN76
Registration
ACTIVE
Expires
2026-11-13
Primary NAICS
541330
Purpose
ALL AWARDS
Export-control exposure
Scoring v1.3 · Methodology
30
of 100
Low exposure
Nothing in this registration suggests controlled work today. That is a statement about the record, not a clearance — a single subcontract can change it without changing any code.
How this score was calculated
Primary industry of 50 24
Additional controlled industries of 20 0
Product codes of 20 0
Registration posture of 10 10
Exposure score raw 34 30
Capped: no manufacturing industry code and no strong product-code evidence — raw score 34 reduced to 30.
This score is an indicator built from public industry and product codes. It is not a jurisdiction determination — only a commodity jurisdiction review of actual articles and technical data establishes what is USML-controlled. It is not a finding about this company's compliance program, and it is not legal advice.
Registered industry codes
5 NAICS · 0 PSC
CodeDescriptionTier
541330Primary Engineering Services C
541618
541620
541690
541990
Registration history
SAM.gov
2026-11-13 · in 74 days
Registration expires
Renewal requires re-attesting to the FAR and DFARS representations, including the export-control provisions.
2025-11-17
Registration activated
2016-09-03
First registered in SAM
Change history accumulates from monthly extracts. This record was first indexed recently, so only the registration dates are available so far.